REMIT POWER PLANTS
MARKET PARTECIPATION ID
12XAET-HANDEL-3
AFFECTED REGIONAL AREA
SWISSGRID
LAST UPDATE
29.05.2023 11:10 UTC
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.03.2023 12:00 UTC
EVENT END
02.08.2023 05:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
26.05.2023 10:00 UTC
EVENT END
02.06.2023 13:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
06.06.2023 05:00 UTC
EVENT END
06.06.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
07.06.2023 05:00 UTC
EVENT END
07.06.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.06.2023 05:00 UTC
EVENT END
13.06.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.06.2023 05:00 UTC
EVENT END
14.06.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
31.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.06.2023 04:30 UTC
EVENT END
19.06.2023 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.06.2023 06:00 UTC
EVENT END
19.06.2023 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
64.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.06.2023 10:30 UTC
EVENT END
19.06.2023 11:00 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.06.2023 11:00 UTC
EVENT END
19.06.2023 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
64.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.06.2023 15:30 UTC
EVENT END
21.06.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.06.2023 05:00 UTC
EVENT END
21.06.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
80.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.06.2023 09:00 UTC
EVENT END
23.06.2023 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.06.2023 14:30 UTC
EVENT END
30.06.2023 00:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.06.2023 00:00 UTC
EVENT END
30.06.2023 02:00 UTC
UNIT
Leventina
UNAVAILABILITY
120.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.06.2023 02:00 UTC
EVENT END
04.07.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.07.2023 05:00 UTC
EVENT END
04.07.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
177.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.07.2023 09:00 UTC
EVENT END
11.07.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
11.07.2023 05:00 UTC
EVENT END
11.07.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
177.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
11.07.2023 09:00 UTC
EVENT END
13.07.2023 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.07.2023 05:30 UTC
EVENT END
13.07.2023 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
135.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.07.2023 09:30 UTC
EVENT END
14.07.2023 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.07.2023 15:00 UTC
EVENT END
18.07.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.07.2023 05:00 UTC
EVENT END
18.07.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.07.2023 09:00 UTC
EVENT END
20.07.2023 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.07.2023 05:30 UTC
EVENT END
20.07.2023 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
86.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.07.2023 09:30 UTC
EVENT END
08.08.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.08.2023 05:00 UTC
EVENT END
11.08.2023 15:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
08.08.2023 05:00 UTC
EVENT END
08.08.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
08.08.2023 09:00 UTC
EVENT END
16.08.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.08.2023 05:00 UTC
EVENT END
16.08.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.08.2023 09:00 UTC
EVENT END
17.08.2023 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.08.2023 05:30 UTC
EVENT END
17.08.2023 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
86.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.08.2023 09:30 UTC
EVENT END
22.08.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.08.2023 05:00 UTC
EVENT END
22.08.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.08.2023 09:00 UTC
EVENT END
24.08.2023 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.08.2023 05:30 UTC
EVENT END
24.08.2023 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
86.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.08.2023 09:30 UTC
EVENT END
27.08.2023 19:30 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
27.08.2023 19:30 UTC
EVENT END
01.09.2023 17:00 UTC
UNIT
Leventina
UNAVAILABILITY
226.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.09.2023 17:00 UTC
EVENT END
12.09.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.09.2023 05:00 UTC
EVENT END
12.09.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.09.2023 09:00 UTC
EVENT END
13.09.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.09.2023 05:00 UTC
EVENT END
13.09.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.09.2023 09:00 UTC
EVENT END
14.09.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.09.2023 05:00 UTC
EVENT END
14.09.2023 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.09.2023 05:30 UTC
EVENT END
14.09.2023 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
135.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.09.2023 09:00 UTC
EVENT END
14.09.2023 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
86.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.09.2023 09:30 UTC
EVENT END
21.09.2023 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.09.2023 05:30 UTC
EVENT END
21.09.2023 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
86.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.09.2023 09:30 UTC
EVENT END
03.10.2023 04:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.10.2023 04:00 UTC
EVENT END
04.10.2023 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
93.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.10.2023 22:00 UTC
EVENT END
05.10.2023 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
142.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.10.2023 15:00 UTC
EVENT END
05.10.2023 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.10.2023 22:00 UTC
EVENT END
09.10.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.10.2023 05:00 UTC
EVENT END
12.10.2023 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.10.2023 05:30 UTC
EVENT END
12.10.2023 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
135.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.10.2023 09:30 UTC
EVENT END
13.10.2023 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.10.2023 14:00 UTC
EVENT END
16.10.2023 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.10.2023 05:30 UTC
EVENT END
20.10.2023 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
86.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.10.2023 14:30 UTC
EVENT END
23.10.2023 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.10.2023 05:00 UTC
EVENT END
27.10.2023 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
27.10.2023 14:00 UTC
EVENT END
04.11.2023 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
06.11.2023 06:00 UTC
EVENT END
10.11.2023 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.11.2023 06:00 UTC
EVENT END
14.11.2023 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.11.2023 06:30 UTC
EVENT END
23.11.2023 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
26.11.2023 23:00 UTC
EVENT END
28.11.2023 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
28.11.2023 06:00 UTC
EVENT END
28.11.2023 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
98.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
28.11.2023 10:00 UTC
EVENT END
05.12.2023 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.12.2023 06:00 UTC
EVENT END
05.12.2023 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.12.2023 10:00 UTC
EVENT END
07.12.2023 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
07.12.2023 06:00 UTC
EVENT END
07.12.2023 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
98.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
07.12.2023 10:00 UTC
EVENT END
13.12.2023 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.12.2023 06:00 UTC
EVENT END
13.12.2023 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.12.2023 10:00 UTC
EVENT END
14.12.2023 06:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.12.2023 06:30 UTC
EVENT END
14.12.2023 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.12.2023 10:30 UTC
EVENT END
19.12.2023 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.12.2023 06:00 UTC
EVENT END
19.12.2023 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.12.2023 10:00 UTC
EVENT END
20.12.2023 06:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.12.2023 06:30 UTC
EVENT END
20.12.2023 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.12.2023 10:30 UTC
EVENT END
21.12.2023 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.12.2023 06:00 UTC
EVENT END
21.12.2023 06:30 UTC
UNIT
Leventina
UNAVAILABILITY
98.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.12.2023 06:30 UTC
EVENT END
21.12.2023 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
106.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.12.2023 10:00 UTC
EVENT END
21.12.2023 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.12.2023 10:30 UTC
EVENT END
01.01.2024 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2024 23:00 UTC
EVENT END
03.03.2024 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.03.2024 06:00 UTC
EVENT END
15.03.2024 17:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.03.2024 17:00 UTC
EVENT END
15.05.2024 05:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.03.2024 20:30 UTC
EVENT END
28.03.2024 23:30 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.04.2024 22:00 UTC
EVENT END
16.04.2024 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.05.2024 05:00 UTC
EVENT END
30.05.2024 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2025 23:00 UTC
EVENT END
30.01.2025 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
63.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.01.2025 23:00 UTC
EVENT END
24.03.2025 20:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.03.2025 06:00 UTC
EVENT END
30.05.2025 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2025 20:30 UTC
EVENT END
27.03.2025 23:30 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
27.03.2025 23:30 UTC
EVENT END
29.03.2025 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.06.2025 22:00 UTC
EVENT END
01.01.2026 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2026 23:00 UTC
EVENT END
28.03.2026 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.03.2026 06:00 UTC
EVENT END
15.05.2026 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
28.03.2026 23:00 UTC
EVENT END
30.04.2026 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.07.2026 22:00 UTC
EVENT END
01.01.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2027 23:00 UTC
EVENT END
16.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.02.2027 06:00 UTC
EVENT END
15.02.2027 17:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.02.2027 17:00 UTC
EVENT END
30.04.2027 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.03.2027 05:00 UTC
EVENT END
16.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.03.2027 16:00 UTC
EVENT END
17.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.03.2027 05:00 UTC
EVENT END
17.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.03.2027 16:00 UTC
EVENT END
23.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2027 05:00 UTC
EVENT END
23.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
121.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2027 16:00 UTC
EVENT END
24.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2027 05:00 UTC
EVENT END
24.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
121.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2027 16:00 UTC
EVENT END
31.03.2027 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.03.2027 22:00 UTC
EVENT END
16.04.2027 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.07.2027 22:00 UTC
EVENT END
31.12.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.12.2027 23:00 UTC
EVENT END
02.01.2028 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2028 23:00 UTC
EVENT END
31.01.2028 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
186.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.01.2028 23:00 UTC
EVENT END
31.03.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
39.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.03.2028 22:00 UTC
EVENT END
01.04.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.04.2028 22:00 UTC
EVENT END
16.04.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2029 23:00 UTC
EVENT END
29.03.2029 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2030 23:00 UTC
EVENT END
03.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.01.2030 23:00 UTC
EVENT END
18.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.01.2030 23:00 UTC
EVENT END
31.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2032 05:00 UTC
EVENT END
23.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2032 05:00 UTC
EVENT END
24.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.03.2032 05:00 UTC
EVENT END
25.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW