Azienda Elettrica Ticinese
REMIT POWER PLANTS


MARKET PARTECIPATION ID
12XAET-HANDEL-3

AFFECTED REGIONAL AREA
SWISSGRID

LAST UPDATE
14.12.2024 11:03 UTC

PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.12.2024 06:00 UTC
EVENT END
16.12.2024 11:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.12.2024 11:30 UTC
EVENT END
16.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.12.2024 06:00 UTC
EVENT END
17.12.2024 14:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.12.2024 05:30 UTC
EVENT END
18.12.2024 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.12.2024 06:00 UTC
EVENT END
18.12.2024 11:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.12.2024 11:30 UTC
EVENT END
18.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
88.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.12.2024 11:30 UTC
EVENT END
19.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
07.01.2025 07:00 UTC
EVENT END
07.01.2025 14:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.01.2025 07:00 UTC
EVENT END
09.01.2025 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
58.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.01.2025 06:00 UTC
EVENT END
25.04.2025 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.01.2025 06:00 UTC
EVENT END
14.01.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.01.2025 11:30 UTC
EVENT END
14.01.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.01.2025 15:30 UTC
EVENT END
15.01.2025 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.01.2025 06:00 UTC
EVENT END
15.01.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.01.2025 11:30 UTC
EVENT END
15.01.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.01.2025 15:30 UTC
EVENT END
15.01.2025 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.01.2025 16:00 UTC
EVENT END
16.01.2025 20:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.01.2025 11:30 UTC
EVENT END
21.01.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
81.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.01.2025 11:30 UTC
EVENT END
23.01.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
29.01.2025 06:30 UTC
EVENT END
29.01.2025 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.02.2025 11:30 UTC
EVENT END
04.02.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
11.02.2025 11:30 UTC
EVENT END
11.02.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.02.2025 11:30 UTC
EVENT END
12.02.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.02.2025 11:30 UTC
EVENT END
18.02.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
81.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.02.2025 11:30 UTC
EVENT END
19.02.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
63.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.02.2025 11:30 UTC
EVENT END
20.02.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.02.2025 06:00 UTC
EVENT END
05.03.2025 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
11.03.2025 11:30 UTC
EVENT END
11.03.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.03.2025 11:30 UTC
EVENT END
12.03.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.03.2025 11:30 UTC
EVENT END
13.03.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.03.2025 11:30 UTC
EVENT END
14.03.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.03.2025 11:30 UTC
EVENT END
18.03.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
39.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.03.2025 11:30 UTC
EVENT END
20.03.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2025 20:30 UTC
EVENT END
27.03.2025 23:30 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.04.2025 10:30 UTC
EVENT END
15.04.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.04.2025 10:30 UTC
EVENT END
16.04.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.04.2025 10:30 UTC
EVENT END
22.04.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.05.2025 10:30 UTC
EVENT END
13.05.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.05.2025 10:30 UTC
EVENT END
14.05.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.05.2025 10:30 UTC
EVENT END
20.05.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.06.2025 10:30 UTC
EVENT END
10.06.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
11.06.2025 10:30 UTC
EVENT END
11.06.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.06.2025 10:30 UTC
EVENT END
17.06.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.07.2025 10:30 UTC
EVENT END
09.07.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.07.2025 10:30 UTC
EVENT END
15.07.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.07.2025 10:30 UTC
EVENT END
16.07.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.07.2025 10:30 UTC
EVENT END
22.07.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.08.2025 10:30 UTC
EVENT END
12.08.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.08.2025 10:30 UTC
EVENT END
13.08.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.08.2025 10:30 UTC
EVENT END
19.08.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.09.2025 10:30 UTC
EVENT END
16.09.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.09.2025 10:30 UTC
EVENT END
17.09.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.09.2025 10:30 UTC
EVENT END
23.09.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.10.2025 05:00 UTC
EVENT END
14.10.2025 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.10.2025 10:30 UTC
EVENT END
14.10.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.10.2025 14:30 UTC
EVENT END
15.10.2025 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.10.2025 10:30 UTC
EVENT END
15.10.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.10.2025 14:30 UTC
EVENT END
17.10.2025 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.10.2025 05:00 UTC
EVENT END
21.10.2025 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.10.2025 10:30 UTC
EVENT END
21.10.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.10.2025 14:30 UTC
EVENT END
23.10.2025 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.10.2025 10:30 UTC
EVENT END
23.10.2025 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.10.2025 14:30 UTC
EVENT END
24.10.2025 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
26.10.2025 06:00 UTC
EVENT END
27.10.2025 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
27.10.2025 06:00 UTC
EVENT END
31.10.2025 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
37.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.10.2025 15:00 UTC
EVENT END
31.10.2025 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.11.2025 06:00 UTC
EVENT END
07.11.2025 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.11.2025 06:00 UTC
EVENT END
14.11.2025 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.11.2025 23:00 UTC
EVENT END
17.11.2025 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.11.2025 06:00 UTC
EVENT END
18.11.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.11.2025 11:30 UTC
EVENT END
18.11.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
177.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.11.2025 15:30 UTC
EVENT END
20.11.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.11.2025 11:30 UTC
EVENT END
20.11.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
162.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.11.2025 15:30 UTC
EVENT END
25.11.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.11.2025 11:30 UTC
EVENT END
25.11.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
177.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.11.2025 15:30 UTC
EVENT END
25.11.2025 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.11.2025 23:00 UTC
EVENT END
26.11.2025 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
26.11.2025 16:00 UTC
EVENT END
01.12.2025 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.12.2025 06:00 UTC
EVENT END
05.12.2025 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.12.2025 15:00 UTC
EVENT END
09.12.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.12.2025 11:30 UTC
EVENT END
09.12.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
98.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.12.2025 15:30 UTC
EVENT END
16.12.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.12.2025 11:30 UTC
EVENT END
16.12.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.12.2025 15:30 UTC
EVENT END
17.12.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.12.2025 11:30 UTC
EVENT END
17.12.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
123.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.12.2025 15:30 UTC
EVENT END
18.12.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.12.2025 11:30 UTC
EVENT END
18.12.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.12.2025 15:30 UTC
EVENT END
22.12.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.12.2025 11:30 UTC
EVENT END
22.12.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.12.2025 15:30 UTC
EVENT END
23.12.2025 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.12.2025 11:30 UTC
EVENT END
23.12.2025 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.12.2025 15:30 UTC
EVENT END
25.01.2026 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.01.2026 06:00 UTC
EVENT END
24.04.2026 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.01.2026 23:00 UTC
EVENT END
17.02.2026 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.02.2026 23:00 UTC
EVENT END
02.04.2026 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.06.2026 22:00 UTC
EVENT END
30.11.2026 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.11.2026 05:00 UTC
EVENT END
01.01.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2027 23:00 UTC
EVENT END
30.01.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
86.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.01.2027 06:00 UTC
EVENT END
18.01.2027 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.01.2027 16:00 UTC
EVENT END
29.01.2027 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
29.01.2027 16:00 UTC
EVENT END
23.04.2027 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.01.2027 23:00 UTC
EVENT END
16.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.03.2027 05:00 UTC
EVENT END
16.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.03.2027 16:00 UTC
EVENT END
17.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.03.2027 05:00 UTC
EVENT END
17.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.03.2027 16:00 UTC
EVENT END
23.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2027 05:00 UTC
EVENT END
23.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
121.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2027 16:00 UTC
EVENT END
25.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.03.2027 05:00 UTC
EVENT END
25.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
121.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.03.2027 16:00 UTC
EVENT END
30.04.2027 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.06.2027 22:00 UTC
EVENT END
05.07.2027 04:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.07.2027 04:00 UTC
EVENT END
10.09.2027 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
170.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.09.2027 15:00 UTC
EVENT END
14.10.2027 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
121.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.10.2027 15:00 UTC
EVENT END
28.10.2027 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
28.10.2027 15:00 UTC
EVENT END
05.12.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.12.2027 23:00 UTC
EVENT END
31.12.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.12.2027 23:00 UTC
EVENT END
29.03.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.01.2028 06:00 UTC
EVENT END
17.03.2028 17:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
29.03.2028 22:00 UTC
EVENT END
01.04.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.04.2028 22:00 UTC
EVENT END
28.04.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.06.2028 22:00 UTC
EVENT END
27.04.2029 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2032 05:00 UTC
EVENT END
23.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2032 05:00 UTC
EVENT END
24.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.03.2032 05:00 UTC
EVENT END
25.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW