Azienda Elettrica Ticinese
REMIT POWER PLANTS


MARKET PARTECIPATION ID
12XAET-HANDEL-3

AFFECTED REGIONAL AREA
SWISSGRID

LAST UPDATE
27.05.2020 09:13 UTC

PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.06.2020 05:00 UTC
EVENT END
09.06.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.06.2020 05:00 UTC
EVENT END
10.06.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.06.2020 05:00 UTC
EVENT END
16.06.2020 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.06.2020 05:30 UTC
EVENT END
16.06.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.06.2020 05:00 UTC
EVENT END
17.06.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.06.2020 05:00 UTC
EVENT END
23.06.2020 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.06.2020 05:30 UTC
EVENT END
23.06.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.06.2020 05:00 UTC
EVENT END
24.06.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.07.2020 05:00 UTC
EVENT END
02.07.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
08.07.2020 05:00 UTC
EVENT END
08.07.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.07.2020 22:00 UTC
EVENT END
14.07.2020 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.07.2020 05:30 UTC
EVENT END
14.07.2020 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
22.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.07.2020 09:30 UTC
EVENT END
15.07.2020 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.07.2020 05:00 UTC
EVENT END
15.07.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
64.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.07.2020 09:00 UTC
EVENT END
17.07.2020 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.07.2020 05:00 UTC
EVENT END
21.07.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.07.2020 05:00 UTC
EVENT END
22.07.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.07.2020 05:00 UTC
EVENT END
23.07.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.08.2020 05:00 UTC
EVENT END
05.08.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
06.08.2020 05:00 UTC
EVENT END
06.08.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.08.2020 05:00 UTC
EVENT END
12.08.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.08.2020 05:00 UTC
EVENT END
18.08.2020 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.08.2020 05:30 UTC
EVENT END
18.08.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.08.2020 05:00 UTC
EVENT END
19.08.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.08.2020 05:00 UTC
EVENT END
20.08.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.09.2020 05:00 UTC
EVENT END
09.09.2020 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.09.2020 05:30 UTC
EVENT END
09.09.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.09.2020 05:00 UTC
EVENT END
10.09.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.09.2020 05:30 UTC
EVENT END
14.09.2020 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.09.2020 05:00 UTC
EVENT END
16.09.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.09.2020 05:00 UTC
EVENT END
22.09.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.09.2020 05:00 UTC
EVENT END
23.09.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.09.2020 05:00 UTC
EVENT END
24.09.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.10.2020 05:00 UTC
EVENT END
06.10.2020 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
06.10.2020 05:00 UTC
EVENT END
09.10.2020 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
37.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.10.2020 14:30 UTC
EVENT END
09.10.2020 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.10.2020 05:00 UTC
EVENT END
13.10.2020 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.10.2020 05:00 UTC
EVENT END
13.10.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
81.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.10.2020 09:00 UTC
EVENT END
14.10.2020 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.10.2020 16:00 UTC
EVENT END
15.10.2020 05:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.10.2020 05:30 UTC
EVENT END
15.10.2020 09:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.10.2020 09:30 UTC
EVENT END
16.10.2020 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.10.2020 05:00 UTC
EVENT END
21.10.2020 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.10.2020 05:00 UTC
EVENT END
21.10.2020 09:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.10.2020 09:00 UTC
EVENT END
23.10.2020 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.10.2020 05:00 UTC
EVENT END
23.10.2020 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
37.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.10.2020 14:30 UTC
EVENT END
26.10.2020 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
26.10.2020 06:00 UTC
EVENT END
30.10.2020 11:00 UTC
UNIT
Leventina
UNAVAILABILITY
63.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.10.2020 11:00 UTC
EVENT END
30.10.2020 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.11.2020 06:00 UTC
EVENT END
05.11.2020 06:30 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.11.2020 06:30 UTC
EVENT END
05.11.2020 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.11.2020 10:30 UTC
EVENT END
06.11.2020 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.11.2020 06:00 UTC
EVENT END
12.11.2020 06:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.11.2020 06:30 UTC
EVENT END
12.11.2020 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.11.2020 10:30 UTC
EVENT END
13.11.2020 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.11.2020 06:00 UTC
EVENT END
17.11.2020 06:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.11.2020 06:30 UTC
EVENT END
17.11.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.11.2020 06:00 UTC
EVENT END
18.11.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.11.2020 06:00 UTC
EVENT END
19.11.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.11.2020 06:00 UTC
EVENT END
25.11.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.12.2020 06:00 UTC
EVENT END
09.12.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.12.2020 06:00 UTC
EVENT END
10.12.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.12.2020 06:00 UTC
EVENT END
15.12.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.12.2020 06:00 UTC
EVENT END
16.12.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.12.2020 06:30 UTC
EVENT END
17.12.2020 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.12.2020 06:00 UTC
EVENT END
22.12.2020 06:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.12.2020 06:30 UTC
EVENT END
22.12.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.12.2020 06:00 UTC
EVENT END
23.12.2020 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.01.2021 23:00 UTC
EVENT END
29.01.2021 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
63.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
29.01.2021 23:00 UTC
EVENT END
31.03.2021 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.10.2021 05:00 UTC
EVENT END
07.10.2021 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.12.2021 06:00 UTC
EVENT END
22.04.2022 15:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2022 23:00 UTC
EVENT END
31.01.2022 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
128.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.01.2022 23:00 UTC
EVENT END
17.03.2022 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
120.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.03.2022 06:00 UTC
EVENT END
31.03.2022 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
134.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.03.2022 22:00 UTC
EVENT END
06.04.2022 20:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2023 23:00 UTC
EVENT END
02.01.2023 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2023 06:00 UTC
EVENT END
03.01.2023 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.01.2023 23:00 UTC
EVENT END
27.01.2023 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
86.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
27.01.2023 23:00 UTC
EVENT END
31.03.2023 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.03.2023 06:00 UTC
EVENT END
31.03.2023 21:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2024 23:00 UTC
EVENT END
02.01.2024 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
74.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2024 23:00 UTC
EVENT END
28.03.2024 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
97.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2025 23:00 UTC
EVENT END
28.03.2025 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
28.03.2025 23:00 UTC
EVENT END
31.03.2025 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2026 23:00 UTC
EVENT END
30.01.2026 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
85.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.01.2026 23:00 UTC
EVENT END
27.03.2026 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
71.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
27.03.2026 23:00 UTC
EVENT END
31.03.2026 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
48.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.01.2027 23:00 UTC
EVENT END
08.01.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
71.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2028 23:00 UTC
EVENT END
31.01.2028 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
232.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.01.2028 23:00 UTC
EVENT END
31.03.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2029 23:00 UTC
EVENT END
29.03.2029 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2030 23:00 UTC
EVENT END
03.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.01.2030 23:00 UTC
EVENT END
18.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.01.2030 23:00 UTC
EVENT END
31.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW