Azienda Elettrica Ticinese
REMIT POWER PLANTS


MARKET PARTECIPATION ID
12XAET-HANDEL-3

AFFECTED REGIONAL AREA
SWISSGRID

LAST UPDATE
19.03.2024 07:03 UTC

PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.03.2024 17:00 UTC
EVENT END
15.05.2024 05:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.03.2024 11:30 UTC
EVENT END
20.03.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.03.2024 11:30 UTC
EVENT END
21.03.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
82.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.03.2024 11:30 UTC
EVENT END
22.03.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.04.2024 10:30 UTC
EVENT END
09.04.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.04.2024 10:30 UTC
EVENT END
10.04.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.04.2024 10:30 UTC
EVENT END
16.04.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.04.2024 10:30 UTC
EVENT END
18.04.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.04.2024 10:30 UTC
EVENT END
23.04.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.04.2024 10:30 UTC
EVENT END
25.04.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
07.05.2024 10:30 UTC
EVENT END
07.05.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
08.05.2024 10:30 UTC
EVENT END
08.05.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.05.2024 10:30 UTC
EVENT END
14.05.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.05.2024 05:00 UTC
EVENT END
30.05.2024 15:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.05.2024 10:30 UTC
EVENT END
16.05.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.05.2024 10:30 UTC
EVENT END
21.05.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.05.2024 10:30 UTC
EVENT END
23.05.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.06.2024 10:30 UTC
EVENT END
04.06.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.06.2024 10:30 UTC
EVENT END
05.06.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
11.06.2024 10:30 UTC
EVENT END
11.06.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.06.2024 10:30 UTC
EVENT END
13.06.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.06.2024 10:30 UTC
EVENT END
18.06.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.06.2024 10:30 UTC
EVENT END
19.06.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
15.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.06.2024 10:30 UTC
EVENT END
20.06.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.07.2024 10:30 UTC
EVENT END
09.07.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.07.2024 10:30 UTC
EVENT END
10.07.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.07.2024 10:30 UTC
EVENT END
16.07.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.07.2024 10:30 UTC
EVENT END
18.07.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.07.2024 10:30 UTC
EVENT END
23.07.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.07.2024 10:30 UTC
EVENT END
25.07.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
06.08.2024 10:30 UTC
EVENT END
06.08.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
07.08.2024 10:30 UTC
EVENT END
07.08.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.08.2024 10:30 UTC
EVENT END
13.08.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
20.08.2024 10:30 UTC
EVENT END
20.08.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.08.2024 10:30 UTC
EVENT END
21.08.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
22.08.2024 10:30 UTC
EVENT END
22.08.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
27.08.2024 03:00 UTC
EVENT END
30.08.2024 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.09.2024 05:00 UTC
EVENT END
04.09.2024 06:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.09.2024 06:00 UTC
EVENT END
04.09.2024 10:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.09.2024 10:00 UTC
EVENT END
04.09.2024 11:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.09.2024 11:00 UTC
EVENT END
04.09.2024 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.09.2024 15:00 UTC
EVENT END
06.09.2024 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.09.2024 05:00 UTC
EVENT END
13.09.2024 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.09.2024 10:30 UTC
EVENT END
17.09.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.09.2024 10:30 UTC
EVENT END
18.09.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.09.2024 10:30 UTC
EVENT END
19.09.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.09.2024 05:00 UTC
EVENT END
27.09.2024 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
09.10.2024 10:30 UTC
EVENT END
09.10.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
10.10.2024 10:30 UTC
EVENT END
10.10.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.10.2024 05:00 UTC
EVENT END
15.10.2024 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.10.2024 10:30 UTC
EVENT END
15.10.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.10.2024 14:30 UTC
EVENT END
18.10.2024 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.10.2024 05:00 UTC
EVENT END
24.10.2024 10:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.10.2024 10:30 UTC
EVENT END
24.10.2024 14:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.10.2024 14:30 UTC
EVENT END
25.10.2024 14:00 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
29.10.2024 11:30 UTC
EVENT END
29.10.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.11.2024 11:00 UTC
EVENT END
06.11.2024 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
06.11.2024 11:30 UTC
EVENT END
06.11.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
37.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
06.11.2024 15:30 UTC
EVENT END
07.11.2024 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
07.11.2024 11:30 UTC
EVENT END
07.11.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
63.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
07.11.2024 15:30 UTC
EVENT END
08.11.2024 22:30 UTC
UNIT
Leventina
UNAVAILABILITY
14.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
11.11.2024 06:00 UTC
EVENT END
13.11.2024 11:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.11.2024 11:30 UTC
EVENT END
13.11.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
30.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
13.11.2024 15:30 UTC
EVENT END
15.11.2024 15:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.11.2024 11:30 UTC
EVENT END
19.11.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
21.11.2024 11:30 UTC
EVENT END
21.11.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
26.11.2024 11:30 UTC
EVENT END
26.11.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
04.12.2024 11:30 UTC
EVENT END
04.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
05.12.2024 11:30 UTC
EVENT END
05.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
12.12.2024 11:30 UTC
EVENT END
12.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.12.2024 11:30 UTC
EVENT END
17.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
49.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.12.2024 11:30 UTC
EVENT END
18.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
19.12.2024 11:30 UTC
EVENT END
19.12.2024 15:30 UTC
UNIT
Leventina
UNAVAILABILITY
57.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2025 23:00 UTC
EVENT END
30.01.2025 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
63.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.01.2025 06:00 UTC
EVENT END
30.04.2025 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.01.2025 23:00 UTC
EVENT END
24.03.2025 20:30 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2025 20:30 UTC
EVENT END
27.03.2025 23:30 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
27.03.2025 23:30 UTC
EVENT END
29.03.2025 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
56.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
30.06.2025 22:00 UTC
EVENT END
01.01.2026 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2026 23:00 UTC
EVENT END
28.03.2026 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.01.2026 06:00 UTC
EVENT END
30.04.2026 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
28.03.2026 23:00 UTC
EVENT END
30.04.2026 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.07.2026 22:00 UTC
EVENT END
01.01.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2027 23:00 UTC
EVENT END
16.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.01.2027 06:00 UTC
EVENT END
15.01.2027 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
15.01.2027 16:00 UTC
EVENT END
31.01.2027 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
114.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.01.2027 16:00 UTC
EVENT END
30.04.2027 16:00 UTC
UNIT
Verzasca
UNAVAILABILITY
38.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.03.2027 05:00 UTC
EVENT END
16.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
16.03.2027 16:00 UTC
EVENT END
17.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.03.2027 05:00 UTC
EVENT END
17.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
79.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
17.03.2027 16:00 UTC
EVENT END
23.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2027 05:00 UTC
EVENT END
23.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
121.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2027 16:00 UTC
EVENT END
24.03.2027 05:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2027 05:00 UTC
EVENT END
24.03.2027 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
121.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2027 16:00 UTC
EVENT END
31.03.2027 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
72.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.03.2027 22:00 UTC
EVENT END
16.04.2027 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
14.07.2027 22:00 UTC
EVENT END
31.12.2027 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.12.2027 23:00 UTC
EVENT END
02.01.2028 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2028 23:00 UTC
EVENT END
31.01.2028 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
186.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.01.2028 23:00 UTC
EVENT END
31.03.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
39.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
31.03.2028 22:00 UTC
EVENT END
01.04.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
32.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.04.2028 22:00 UTC
EVENT END
16.04.2028 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
02.01.2029 23:00 UTC
EVENT END
29.03.2029 22:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
01.01.2030 23:00 UTC
EVENT END
03.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
03.01.2030 23:00 UTC
EVENT END
18.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
154.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
18.01.2030 23:00 UTC
EVENT END
31.01.2030 23:00 UTC
UNIT
Leventina
UNAVAILABILITY
147.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
23.03.2032 05:00 UTC
EVENT END
23.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
24.03.2032 05:00 UTC
EVENT END
24.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
23.00 MW
PRODUCTION PLANNED UNAVAILABILITY
EVENT START
25.03.2032 05:00 UTC
EVENT END
25.03.2032 16:00 UTC
UNIT
Leventina
UNAVAILABILITY
25.00 MW